Guide · Businesses · 4 min read · Updated 17 November 2026
How Much Does Factory Flooring Cost in the UK?
Short answer
Factory flooring in the UK costs £12–£25 per m² for a light epoxy seal, £20–£40 per m² for high-build epoxy and £35–£60 per m² for 2–4 mm self-smoothing epoxy. Polyurethane screeds for food and drink areas cost £55–£95 per m². Shot blasting preparation adds £5–£12 per m², and concrete joint repairs cost £40–£120 per linear metre.
Typical factory flooring prices in 2026
Industrial floors are priced per square metre, because labour and material both scale with area. The system you choose sets the base rate, and the condition of the existing concrete, the size of the area and the working conditions adjust it. A thin seal on clean, sound concrete is the cheapest option. A thick polyurethane screed in a busy food plant, laid over a weekend shutdown with coving and drainage details, sits at the top of the range.
The guide prices below are for typical jobs on reasonably sound concrete. We confirm one fixed price after a site survey, once the floor condition, usage and programme are known.
| System | Guide price | Typical use |
|---|---|---|
| Epoxy floor seal or thin coating | £12–£25 per m² | Stores and low-traffic areas |
| High-build epoxy coating | £20–£40 per m² | Workshops and warehouses with forklift traffic |
| Self-smoothing epoxy (2–4 mm) | £35–£60 per m² | Busy manufacturing and clean areas |
| Polyurethane screed (6–9 mm) | £55–£95 per m² | Food and drink production with hot washdowns |
| Concrete joint repair | £40–£120 per linear metre | Failed joints on forklift routes |
| Shot blasting preparation | £5–£12 per m² | Surface preparation before coatings |
Why preparation drives the final cost
Resin floors only perform if they bond to the concrete below. That means removing laitance, old coatings, oil, grease and contamination so the resin can key into a clean, open surface. Shot blasting is the usual method for large open areas. Diamond grinding is used at edges, on smaller areas or where a smoother profile is needed, and scabbling or planing removes thicker coatings.
Floors soaked with oil or chemicals, or covered in several layers of old paint, take far longer to prepare than clean concrete. Damp is another issue. Slabs without an effective damp-proof membrane can push moisture up under a coating and cause it to blister. A survey tests the floor so the right system and preparation are priced from the start.
Old floor paints are a common hidden cost. A floor that looks like bare concrete may have been painted years ago, and that paint has to come off completely before new resin goes down. Testing a few areas during the survey shows what is there, so the preparation allowance is realistic.
- Shot blasting for large open areas
- Diamond grinding for edges, small areas and coating removal
- Crack, hole and joint repairs before coating
- Moisture testing and, where needed, a damp-tolerant primer
- Degreasing heavily contaminated areas
Choosing the right system for the budget
The cheapest floor is not always the best value. A thin epoxy seal looks good when new and controls dust, but under heavy forklift traffic it can wear through in high-traffic aisles. A high-build coating or self-smoothing system costs more up front but lasts much longer in production areas, so the cost per year is often lower.
Match the system to what the floor actually faces. Steel-wheeled trolleys, dropped components, hot water, oils, acids and constant wet cleaning all need different properties. Telling the flooring contractor exactly what happens in each area is the best way to avoid paying for more than you need, or less than the floor demands.
Other costs to plan for
Beyond the floor itself, many projects include extras that should be priced clearly. Safety line marking, pedestrian walkways and hazard zones are often applied after the main floor. Coving at wall junctions is common in food and pharmaceutical areas. Drainage channels and falls, expansion joints and upstands around machinery all add detail work.
Working hours matter too. Many factories cannot stop production, so floors are laid over weekends, shutdowns or in phases. Out-of-hours and phased working takes more planning and labour than one continuous job. Clear the area of stock, racking and machinery where possible, or allow for moving and protecting equipment in the price.
If machinery cannot be moved, the floor can be laid around plinths and bases with neat upstands, but this takes extra cutting and detailing time.
- Line marking and safety zones
- Coving at walls and plinths
- Drainage and falls to gullies
- Joint detailing and expansion joints
- Phased, night or weekend working
How long installation takes
A small area of epoxy coating on prepared concrete can be laid and ready for light foot traffic within a day or two. Larger areas and thicker systems take longer, because each coat must cure before the next goes on. Polyurethane screeds are often chosen partly because some systems allow quicker return to service, which suits food plants with tight shutdown windows.
Cure times depend heavily on temperature. Cold buildings slow curing and can affect the finish, so heating may be needed in winter. Ask for a clear programme showing when the floor can take foot traffic, light vehicles and full forklift loads, and plan production around it.
Getting an accurate fixed price
To price accurately, we need the area in square metres, a description of what happens on the floor, photos of its current condition and any known problems such as damp, cracks or failed joints. Tell us whether production must continue during the work, and whether there are weekends or shutdown periods available.
We then confirm one fixed price covering preparation, materials, installation and any agreed details such as coving or line marking. If the survey finds something that affects the system choice, such as rising damp or a weak slab, we explain the options before work is booked.
Questions people also ask
What is the cheapest factory floor finish?
A thin epoxy seal on prepared concrete is usually the cheapest, at £12–£25 per m². It controls dust and makes the floor easier to clean, but it suits light-duty areas such as stores. Busy forklift routes and production areas usually need a thicker system to last.
Is shot blasting always needed before a resin floor?
Some form of mechanical preparation is almost always needed, because resin must bond to clean, open concrete. Shot blasting is common for large areas. Diamond grinding suits edges, small areas and some coating removal. Simply cleaning or etching the floor rarely gives a reliable bond.
Can a factory floor be laid without stopping production?
Often, yes. Work can be phased area by area, carried out at night or over weekends, or planned for shutdown periods. Fast-cure systems help. It takes more planning, so explain your production schedule at the survey and the programme can be built around it.
Written and checked by the Factory Flooring team. Read our editorial policy.
More guides
Epoxy vs Polyurethane Factory Flooring: Which Is Best?
Epoxy flooring suits dry warehouses, workshops and light to medium manufacturing. It is hard, durable and costs £20–£60 per m² depending on…
How Resin Factory Floors Are Installed: Step by Step
A resin factory floor is installed in stages. The contractor surveys and moisture-tests the slab, prepares it by shot blasting or diamond grinding,…
Anti-Slip Factory Flooring: Rules, Testing and Options
UK workplace floors must not be slippery so far as reasonably practicable under the Workplace (Health, Safety and Welfare) Regulations 1992. Slip…
Food Factory Flooring Requirements in the UK
UK food factory floors must be kept in sound condition and be easy to clean and, where necessary, disinfect under food hygiene law, which usually…
Get a free factory flooring quote
Tell us what you need and we'll come back with a clear price.
Request a quote