Factory Flooring

Factory Flooring prices

Factory flooring is usually priced per square metre, with costs depending on the system, thickness and how much preparation the existing concrete needs. Large areas get lower rates, while small or complex areas with coving, drains and repairs cost more. Weekend and shutdown working affects the price. These are typical UK guide prices for 2026.

JobGuide priceNotes
Epoxy floor seal or thin coating£12–£25 per m²Light-duty coating on prepared concrete for stores and low-traffic areas.
High-build epoxy coating£20–£40 per m²Workshops, warehouses and production areas with forklift traffic.
Self-smoothing epoxy (2–4 mm)£35–£60 per m²Jointless, durable floor for busy manufacturing and clean areas.
Polyurethane screed (6–9 mm)£55–£95 per m²Food and drink production areas with hot washdowns and chemicals.
Concrete joint repair£40–£120 per linear metreCutting out and rebuilding failed joints on forklift routes.
Shot blasting preparation£5–£12 per m²Surface preparation before coatings; heavy contamination or grinding costs more.

Guide prices for 2026. Your quote is a fixed price for the job you describe.

What affects the price

  • The condition of the existing concrete affects preparation and repair costs significantly.
  • System choice and thickness drive material costs, with PU screeds costing more than epoxy coatings.
  • Coving, drains, joints and upstands add labour compared with open floor areas.
  • Out-of-hours or phased working around production usually increases the price.
  • Moisture in the slab may require special primers or delays, adding cost and time.

How Much Does Factory Flooring Cost in the UK?

Factory flooring in the UK costs £12–£25 per m² for a light epoxy seal, £20–£40 per m² for high-build epoxy and £35–£60 per m² for 2–4 mm self-smoothing epoxy. Polyurethane screeds for food and drink areas cost £55–£95 per m². Shot blasting preparation adds £5–£12 per m², and concrete joint repairs cost £40–£120 per linear metre.

Industrial floors are priced per square metre, because labour and material both scale with area. The system you choose sets the base rate, and the condition of the existing concrete, the size of the area and the working conditions adjust it. A thin seal on clean, sound concrete is the cheapest option. A thick polyurethane screed in a busy food plant, laid over a weekend shutdown with coving and drainage details, sits at the top of the range.

The guide prices below are for typical jobs on reasonably sound concrete. We confirm one fixed price after a site survey, once the floor condition, usage and programme are known.

Read the full cost guide →

Prices by service

Pricing questions

How much does factory flooring cost per square metre?

Factory flooring typically costs £12 to £25 per m² for a thin epoxy coating, £35 to £60 for self-smoothing epoxy, and £55 to £95 for polyurethane screed in 2026. Preparation, repairs, coving and drains add to the price. Large areas usually get lower rates per square metre.

Get a free factory flooring quote

Tell us what you need and we'll come back with a clear price.

Request a quote