Factory Flooring
Epoxy Resin Floor Coatings
Hard-wearing epoxy coatings and self-smoothing systems for warehouses, workshops and light manufacturing, with optional anti-slip finishes.

What's involved
Epoxy resin is the workhorse of factory flooring. Thin floor seals of under 0.5 mm suit low-traffic areas, high-build coatings of around 0.5 mm to 1 mm suit workshops and stores, and self-smoothing epoxy of 2 mm to 4 mm gives a jointless, durable floor for busy production areas. The contractor first shot blasts or diamond grinds the concrete to remove laitance, old coatings and contamination, then repairs cracks and holes with resin mortar. A primer is applied, followed by the epoxy layers, with aggregate broadcast into the wet resin where anti-slip performance is needed. Most epoxy systems can take foot traffic within 24 hours and full forklift traffic after several days, depending on temperature. Concrete must be dry, typically below a stated moisture level, so new slabs may need weeks to dry. Plan to clear the area completely and maintain heating if the building is cold.
How we handle it
Site survey and testing
The contractor visits to assess the floor, traffic, chemicals, temperatures and cleaning regime. They test concrete moisture, surface strength and contamination, and note drainage, joints and problem areas.
Specification and quote
You receive a specification describing the preparation method, system type, thickness, finish and colour, plus a quote and programme that shows how long each area will be out of use.
Planning the shutdown
Work is scheduled around production, often over weekends, shutdowns or in phases. Areas are cleared of stock and machinery, and temperature and ventilation are arranged.
Preparation and installation
Concrete is shot blasted or ground, repaired and primed. The resin or screed system is installed in layers, with anti-slip aggregate, coving and markings as specified.
Curing and handover
The floor is left to cure before foot and vehicle traffic resumes. The contractor inspects the work with you and provides maintenance and cleaning guidance.
Price guide
Factory flooring is usually priced per square metre, with costs depending on the system, thickness and how much preparation the existing concrete needs. Large areas get lower rates, while small or complex areas with coving, drains and repairs cost more. Weekend and shutdown working affects the price. These are typical UK guide prices for 2026.
- High-build epoxy coating: £20–£40 per m². Workshops, warehouses and production areas with forklift traffic.
- Epoxy floor seal or thin coating: £12–£25 per m². Light-duty coating on prepared concrete for stores and low-traffic areas.
- Shot blasting preparation: £5–£12 per m². Surface preparation before coatings; heavy contamination or grinding costs more.
Questions about epoxy resin floor coatings
How much does factory flooring cost per square metre?
Factory flooring typically costs £12 to £25 per m² for a thin epoxy coating, £35 to £60 for self-smoothing epoxy, and £55 to £95 for polyurethane screed in 2026. Preparation, repairs, coving and drains add to the price. Large areas usually get lower rates per square metre.
What is the best flooring for a factory?
It depends on the process. Epoxy resin suits most warehouses, workshops and light manufacturing. Polyurethane screed is better for food, drink and areas with hot washdowns or thermal shock. Heavy engineering may need thick resin mortars. A contractor should assess traffic, chemicals and temperature first.
How long does resin flooring last?
A well-installed epoxy coating typically lasts five to ten years under normal industrial use, while thicker self-smoothing and polyurethane screed systems can last ten to twenty years. Life depends on traffic, impact, chemicals, cleaning and, above all, how well the concrete was prepared.
Other services
Polyurethane and Heavy-Duty Screeds
Polyurethane screeds that resist thermal shock, hot washdowns, chemicals and heavy impact in food and drink production areas.
Concrete Floor Repairs and Joint Replacement
Repair spalled concrete, potholes, cracks and broken joints that damage forklift wheels and create trip hazards.
Anti-Slip Flooring
Textured resin finishes and aggregates matched to your process, so wet, oily or dusty floors stay safe underfoot.
Floor Line Marking and Safety Zones
Durable aisle lines, pedestrian walkways, hazard zones and forklift routes marked in resin paint or embedded in the floor system.
Floor Preparation and Coating Removal
Shot blasting, diamond grinding and scabbling to remove old coatings and contamination before new flooring goes down.
Epoxy Resin Floor Coatings near you
Get a free factory flooring quote
Tell us what you need and we'll come back with a clear price.
Request a quote