Factory Flooring
Concrete Floor Repairs and Joint Replacement
Repair spalled concrete, potholes, cracks and broken joints that damage forklift wheels and create trip hazards.

What's involved
Damaged concrete is one of the main causes of forklift breakdowns and accidents. Contractors cut out spalled areas around joints and potholes, prepare the exposed concrete, and fill with fast-setting epoxy or polymer-modified mortars that cure quickly enough to get the floor back in use within hours. Failed joints, which often crumble at the edges as pallet truck wheels pass over them, are cut out and rebuilt with a semi-rigid joint filler or replaced with armoured joint systems for heavy traffic routes. Cracks are routed out and injected or filled with resin. Rocking slabs may be stabilised with resin injection beneath. Repairs can often be done zone by zone or overnight so production carries on. Before booking, mark up problem areas and note forklift routes, as busy routes need stronger repair materials. Most repairs can take traffic within a few hours to a day.
How we handle it
Site survey and testing
The contractor visits to assess the floor, traffic, chemicals, temperatures and cleaning regime. They test concrete moisture, surface strength and contamination, and note drainage, joints and problem areas.
Specification and quote
You receive a specification describing the preparation method, system type, thickness, finish and colour, plus a quote and programme that shows how long each area will be out of use.
Planning the shutdown
Work is scheduled around production, often over weekends, shutdowns or in phases. Areas are cleared of stock and machinery, and temperature and ventilation are arranged.
Preparation and installation
Concrete is shot blasted or ground, repaired and primed. The resin or screed system is installed in layers, with anti-slip aggregate, coving and markings as specified.
Curing and handover
The floor is left to cure before foot and vehicle traffic resumes. The contractor inspects the work with you and provides maintenance and cleaning guidance.
Price guide
Factory flooring is usually priced per square metre, with costs depending on the system, thickness and how much preparation the existing concrete needs. Large areas get lower rates, while small or complex areas with coving, drains and repairs cost more. Weekend and shutdown working affects the price. These are typical UK guide prices for 2026.
- Epoxy floor seal or thin coating: £12–£25 per m². Light-duty coating on prepared concrete for stores and low-traffic areas.
- Shot blasting preparation: £5–£12 per m². Surface preparation before coatings; heavy contamination or grinding costs more.
- Concrete joint repair: £40–£120 per linear metre. Cutting out and rebuilding failed joints on forklift routes.
Questions about concrete floor repairs and joint replacement
How much does factory flooring cost per square metre?
Factory flooring typically costs £12 to £25 per m² for a thin epoxy coating, £35 to £60 for self-smoothing epoxy, and £55 to £95 for polyurethane screed in 2026. Preparation, repairs, coving and drains add to the price. Large areas usually get lower rates per square metre.
What is the best flooring for a factory?
It depends on the process. Epoxy resin suits most warehouses, workshops and light manufacturing. Polyurethane screed is better for food, drink and areas with hot washdowns or thermal shock. Heavy engineering may need thick resin mortars. A contractor should assess traffic, chemicals and temperature first.
How long does resin flooring last?
A well-installed epoxy coating typically lasts five to ten years under normal industrial use, while thicker self-smoothing and polyurethane screed systems can last ten to twenty years. Life depends on traffic, impact, chemicals, cleaning and, above all, how well the concrete was prepared.
Other services
Epoxy Resin Floor Coatings
Hard-wearing epoxy coatings and self-smoothing systems for warehouses, workshops and light manufacturing, with optional anti-slip finishes.
Polyurethane and Heavy-Duty Screeds
Polyurethane screeds that resist thermal shock, hot washdowns, chemicals and heavy impact in food and drink production areas.
Anti-Slip Flooring
Textured resin finishes and aggregates matched to your process, so wet, oily or dusty floors stay safe underfoot.
Floor Line Marking and Safety Zones
Durable aisle lines, pedestrian walkways, hazard zones and forklift routes marked in resin paint or embedded in the floor system.
Floor Preparation and Coating Removal
Shot blasting, diamond grinding and scabbling to remove old coatings and contamination before new flooring goes down.
Concrete Floor Repairs and Joint Replacement near you
Get a free factory flooring quote
Tell us what you need and we'll come back with a clear price.
Request a quote